Selections & Variations · Phase 2 preview

Protect margin before the order is placed

Every client selection is reconciled against the signed allowance. Anything above allowance is flagged for a variation.

Workflow

  1. 1Client enters selections
  2. 2Allowances and upgrades checked
  3. 3Variations flagged
  4. 4Internal approval and supplier alignment
  5. 5Final selections pack prepared

Selections

  • FlooringGreenwood VillaDiscrepancyAwaiting supplier

    European oak engineered timber — 180mm

    Allowance $12,000Selected $17,400Upgrade $5,400

    Selected product is $5,400 above the signed allowance. Proceeding without a variation reduces project margin by approximately 1.1%.

    Source: Email — Nguyen family, 2 Jul12 Jun: Signed selection: hybrid plank flooring within allowance2 Jul: Client emailed requesting European oak upgrade
  • Kitchen benchtopsGreenwood VillaApprovedConfirmed

    20mm engineered stone — Snow

    Allowance $8,500Selected $8,500Within allowance
    Source: Selections pack v218 Jun: Client confirmed selection within allowance
  • TapwareMarion RiseAwaiting internalNot issued

    Matte black mixer set

    Allowance $3,200Selected $3,950Upgrade $750

    Upgrade of $750 requires a variation before ordering.

    Source: Showroom selection sheet26 Jun: Client selected upgrade at showroom
  • Facade renderProspect CourtAwaiting clientNot issued

    Full acrylic render with feature cladding

    Allowance $9,800Selected $11,200Upgrade $1,400
    Source: Design meeting notes1 Jul: Options issued to client

Variations

  • VAR-1017Greenwood VillaAwaiting approval

    Upgrade to European oak engineered timber flooring

    $5,400 · margin impact -1.1% · raised by Aamico AI GM

    Client request is inconsistent with the signed selection. A variation is required before the flooring order is placed.

  • VAR-1014Marion RiseApproved

    Additional external power points (3)

    $1,150 · margin impact -0.2% · raised by Michael Toh

    Approved and issued to Northline Electrical for pricing alignment.

  • VAR-1019Prospect CourtDraft

    Feature cladding to front facade

    $1,400 · margin impact -0.3% · raised by Tom Ellery

    Awaiting client decision on facade options before the variation is issued.

Aamico AI Operating System — interactive demonstration. All operational data shown is synthetic.Viewing: This week · /selections